Everything promised on a call and everything still owed. Dates are measured against 28 Apr 2026, the most recent call in the corpus — not today.
| Commitment | Owner | Due?The parsed date, with the phrase actually said on the call beneath it. | Action type | Account | Call | ||
|---|---|---|---|---|---|---|---|
| Run the baseline HIPAA report after connector setup is complete. | No owner | 8 Apr 2026Pastsaid “Wednesday or Thursday” | internal review or investigation?Conduct QA, audit, verification, investigation, post-mortem, root-cause analysis, or assessment, including testing and analyzing to understand or validate something. | Clearwater Medical | Aegis / Clearwater Medical - Comply v… 7 Apr 2026 | ||
| Complete emergency rebalance migration of Summit Trust tenant to a less-loaded node cluster | No owner | 15 Apr 2026Pastsaid “within two to four hours” | engineering or configuration change?Implement, deploy, fix, configure, activate, enable, migrate, backfill, or decommission a product, system, or infrastructure, including code changes and environment configuration. | Summit Trust | Support Case #6147 - Summit Trust Det… 15 Apr 2026 | ||
| Decommission v1 reporting service after two weeks post-GA ComplyImplied only | No owner | 21 Apr 2026Pastsaid “two weeks post-GA” | engineering or configuration change?Implement, deploy, fix, configure, activate, enable, migrate, backfill, or decommission a product, system, or infrastructure, including code changes and environment configuration. | Internal | Comply v2 - GA Deployment Plan 1 Apr 2026 | ||
| Activate Comply v2 on Redwood's tenant and complete configuration review. | No owner | 10 May 2026said “before that working session” | engineering or configuration change?Implement, deploy, fix, configure, activate, enable, migrate, backfill, or decommission a product, system, or infrastructure, including code changes and environment configuration. | Redwood Clinical | Aegis / Redwood Clinical - ISO 27001… 26 Apr 2026 | ||
| Conduct a chaos engineering run in staging to validate the node failure fix DetectImplied only | No owner | 15 May 2026said “mid-May” | internal review or investigation?Conduct QA, audit, verification, investigation, post-mortem, root-cause analysis, or assessment, including testing and analyzing to understand or validate something. | Internal | All Hands - April Update 26 Apr 2026 | ||
| Fix the PCI DSS export PDF formatting inconsistency ComplyImplied only | No owner | No date?No deadline was stated on the call. | engineering or configuration change?Implement, deploy, fix, configure, activate, enable, migrate, backfill, or decommission a product, system, or infrastructure, including code changes and environment configuration. | Internal | All Hands - April Update 26 Apr 2026 | ||
| Document the Q2 prioritization rationale for Detect reliability vs feature work DetectImplied only | No owner | No date?No deadline was stated on the call. | document or write up?Write, draft, compile, update, or finalize a document, report, runbook, case note, plan, or summary, including creating shared docs and drafting communications. | Internal | All Hands - April Update 26 Apr 2026 | ||
| Start internal conversation on GDPR framework scoping | No owner | No date?No deadline was stated on the call. | notify or loop in?Inform, flag, copy, connect, or give a heads-up to a person or team for awareness, including internal alerts and handoffs that are not formal escalations. | Internal | Comply v2 - Adoption Metrics Review 22 Apr 2026 | ||
| Implement per-tenant concurrency throttle as temporary measure | No owner | No date?No deadline was stated on the call. | engineering or configuration change?Implement, deploy, fix, configure, activate, enable, migrate, backfill, or decommission a product, system, or infrastructure, including code changes and environment configuration. | Internal | Protect Performance - Scalability Con… 15 Apr 2026 | ||
| Run a quick legal sanity check on the customer-facing summary with Jared in Legal. | No owner | No date?No deadline was stated on the call. | internal review or investigation?Conduct QA, audit, verification, investigation, post-mortem, root-cause analysis, or assessment, including testing and analyzing to understand or validate something. | Internal | Detect Reliability - 30-Day Review 7 Apr 2026 | ||
| Schedule guided walkthrough with Trailhead's compliance team once Comply is active. ComplyImplied only | No owner | No date?No deadline was stated on the call. | schedule session?Arrange, coordinate, or block time for a meeting, call, demo, working session, or walkthrough, including inviting participants and confirming attendance. | Trailhead | Aegis / Trailhead Marketplace - Renew… 5 Apr 2026 |