SupportResolvedFriday, 3 Apr 2026·Forge Industries

Support Case #1993 - Forge Industries Comply v2 Early Access Question

Forge learns Comply v2 GA is April 7; custom labeling question to be followed up

Forge's security manager Dana Moretti asked whether they could get early access to AegisCloud Comply v2, wanting on-demand multi-framework reporting ahead of a SOC 2 audit. Elena Vasquez told them v2 is in final QA and will hit general availability on April 7, available to all existing Comply customers, with reporting for SOC 2, PCI DSS, HIPAA, and ISO 27001. The update will roll out automatically, though customers will need to map controls to new framework templates. Forge said this removes their need to look at a separate HIPAA point solution. The vendor agreed to send the webinar invite and follow up in writing on custom control labeling.

Read the full transcript →43 turns · 8 min captured of 26 min stated

How the call went

Customer sentiment moved from neutral to clearly positive as v2's timing and fit were confirmed, with Dana enthusiastic about avoiding a separate HIPAA tool and both customers thanking the vendor.

Opening

0

Close

+1
Overall+1
+2+10-1-2start of callend

7 scored turns of 43. Hover a point for the model's reason, or read the transcript.

How the conversation ran?Talk share is measured from speech time in the captured portion of the transcript.

AegisCloud 58%Customer 42%
Questions we asked
3
Questions they asked
9
Turns
43
Longest silence
2s

Who was on the call

Customer

  • Dana Moretti?Matched on an initial rather than a full name, so attribution is weaker.
  • Gerald Hutchins?Matched on an initial rather than a full name, so attribution is weaker.

What happened6

The moments the model picked out, grouped by kind. Each opens onto the turns behind it.

Issue raised3?A problem was brought up on the call.

  • Dana explains that Forge manages SOC 2, HIPAA, and PCI reporting manually in Comply and that pulling reports for each framework is a lot of work.

  • Dana asks whether Forge can get early access to Comply v2 because its SOC 2 audit window is approaching and on-demand multi-framework reporting would help.

  • Dana asks whether v2 supports tagging controls with internal policy numbers; Elena says v2 has a custom metadata option but she will verify and follow up in writing.

Commitment1?Someone committed to doing something.

  • David commits to sending the April 10 webinar invite and to follow up on the custom control labeling question by end of week.

Decision1?A decision was reached.

  • Elena reveals Comply v2 is in final QA and will be generally available on April 7 for all existing Comply customers, with SOC 2, PCI DSS, HIPAA, and ISO 27001 reporting.

Expansion signal1?Interest in buying more, or in a broader rollout.

  • Dana reacts positively, saying this means Forge likely does not need a separate HIPAA point solution and can keep compliance in one platform.

What was promised4

CommitmentOwnerDueAction type
Send the April 10 Comply v2 customer webinar calendar invite to Dana and her two compliance analysts.David KimAegisCloudNo date givenschedule session?Arrange, coordinate, or block time for a meeting, call, demo, working session, or walkthrough, including inviting participants and confirming attendance.
Email David the addresses of the two compliance analysts to add to the webinar invitation.
ComplyImplied only
Dana MorettiCustomerNo date givensend artefact?Deliver or transmit a prepared document, report, email, or update to a recipient by sharing, emailing, circulating, or handing it over.
Map existing controls to the new framework templates in Comply settings when v2 rolls out.
ComplyImplied only
No ownerNo date givenengineering or configuration change?Implement, deploy, fix, configure, activate, enable, migrate, backfill, or decommission a product, system, or infrastructure, including code changes and environment configuration.
Follow up in writing on whether Comply v2 supports custom control labeling with internal policy numbers.David KimAegisCloud
3 Apr 2026said “by end of week
follow up?Check on the status of a prior action, open question, or pending deliverable, or chase and reconnect with someone to keep an item moving.

Left unanswered1

  • Does Comply v2 support custom metadata fields or tags for controls with internal policy numbers?

    AegisCloudProduct Roadmap

Themes and issues4

What the call was about, and the specific issue recorded under each theme.

ThemeAs the model phrased it?The wording the model used before mapping it to the shared taxonomy.Issue
Compliance?Calls about regulatory, audit, and security compliance obligations, reporting, and readiness.compliance reportingmulti-framework report generation
Product Roadmap?Calls about the product roadmap, planning, launch, release, and delivery of new capabilities.product releasegeneral availability timing
Infrastructure?Calls about infrastructure, architecture, deployment, upgrades, and system configuration.upgrade preparationcontrol mapping configuration
Product Feedback?Calls about feedback on product features, including feature requests and suggestions.feature requestcustom control labeling

Products mentioned

1 mentions

  • Comply

    In usesaid “Aegis Comply

Numbers stated on this call4

Values are shown exactly as they were spoken.

ClaimAs spokenMetricStated by
Comply v2 general availability dateApril 7thdateElena Vasquez
Comply v2 customer webinar dateApril 10thdateDavid Kim
Length of time Forge has used Complyabout eight monthsdurationDana Moretti
Expected report rendering time in Comply v2a minute or tworesponse timeElena Vasquez

Coaching4

How the AegisCloud side handled the call.

Strengths (3)

  • Elena tied the v2 release details directly back to Forge's specific frameworks and audit pain points, confirming fit rather than just reading release notes.

  • Elena answered Gerald's question about report lag plainly and without dismissing it, clarifying that the data is continuously synced.

  • David secured concrete next steps with an owner and a deadline.

Improvement notes (1)

  • The migration guide will be published on the same day as the GA release, which leaves no lead time for customers to prepare their control mappings ahead of the rollout.

    Clarity?How clearly the rep explained things.FYI

How far to trust this call

Every fact above was extracted from the captured portion of the transcript only.

Transcript coverage31%

8 min captured of 26 min stated. Anything said in the remaining 17 min is absent from this page.

Mean transcription confidence93%

0 turns flagged low-confidence.

  • Clocks unaligned(warning)

    3 participant(s) speak before joining — transcript and events are on different clocks. Do NOT derive absolute timestamps by joining these two sources.

  • Partial transcript(warning)

    transcript covers 30.5% of a 25.6min meeting; 17.1min after the final turn is unaccounted for

The model's own note: Transcript is partial (8.4 minutes); analysis covers only the available portion.

Extracted 2 Aug 2026 by deepseek-v4-flash · extractor v1.0.0 · schema v1.1.0 · extended thinking on · 21,749 tokens